Disinfection Tablet Press Maintenance Log Template
Introduction
A well-maintained disinfection tablet press is essential for ensuring consistent product quality, operational efficiency, and compliance with industry standards. Regular maintenance helps prevent unexpected breakdowns, prolongs equipment lifespan, and ensures worker safety.
This maintenance log template provides a structured approach to documenting inspections, cleaning, lubrication, and repairs for disinfection tablet presses. It includes daily, weekly, monthly, and annual maintenance checklists, troubleshooting guidelines, and a record-keeping system.
---
1. Daily Maintenance Log
Date: _______________
Operator Name: _______________
Shift: _______________ (Morning/Afternoon/Night)
| Task | Check (✔) | Notes |
|----------|--------------|----------|
| 1. Visual Inspection | |
| - Check for visible damage or wear on press components | |
| - Inspect hydraulic/pneumatic lines for leaks | |
| - Ensure safety guards are in place | |
| 2. Cleaning | |
| - Remove dust, debris, and residue from press surfaces | |
| - Clean hopper and feed system | |
| - Wipe down control panel and touchpoints | |
| 3. Lubrication | |
| - Apply lubricant to moving parts (if required) | |
| 4. Operational Check | |
| - Run test cycle to ensure smooth operation | |
| - Verify tablet weight and hardness consistency | |
| 5. Safety Check | |
| - Confirm emergency stop function works | |
| - Check for loose bolts or misaligned parts | |
Issues Identified:
- ________________________________________________________
- ________________________________________________________
Corrective Actions Taken:
- ________________________________________________________
- ________________________________________________________
Maintenance Performed By: _______________
Supervisor Approval: _______________
---
2. Weekly Maintenance Log
Date: _______________
Technician Name: _______________
| Task | Check (✔) | Notes |
|----------|--------------|----------|
| 1. Mechanical Inspection | |
| - Inspect punches and dies for wear or damage | |
| - Check belt tension and alignment | |
| - Examine bearings and gears for wear | |
| 2. Hydraulic/Pneumatic System | |
| - Check fluid levels and top up if needed | |
| - Inspect hoses and connections for leaks | |
| 3. Electrical Components | |
| - Inspect wiring for fraying or damage | |
| - Test sensors and limit switches | |
| 4. Deep Cleaning | |
| - Disassemble and clean critical components | |
| - Remove buildup in compression zone | |
Issues Identified:
- ________________________________________________________
- ________________________________________________________
Corrective Actions Taken:
- ________________________________________________________
- ________________________________________________________
Maintenance Performed By: _______________
Supervisor Approval: _______________
---
3. Monthly Maintenance Log
Date: _______________
Technician Name: _______________
| Task | Check (✔) | Notes |
|----------|--------------|----------|
| 1. Punch & Die Maintenance | |
| - Measure punch length and replace if worn | |
| - Inspect die bores for scoring or deformation | |
| 2. Calibration Check | |
| - Verify tablet weight and thickness settings | |
| - Adjust compression force if necessary | |
| 3. Motor & Drive System | |
| - Check motor brushes and commutators | |
| - Inspect drive belts and chains | |
| 4. Software & Control System | |
| - Update firmware (if applicable) | |
| - Backup operational data | |
Issues Identified:
- ________________________________________________________
- ________________________________________________________
Corrective Actions Taken:
- ________________________________________________________
- ________________________________________________________
Maintenance Performed By: _______________
Supervisor Approval: _______________
---
4. Annual Maintenance Log
Date: _______________
Technician Name: _______________
| Task | Check (✔) | Notes |
|----------|--------------|----------|
| 1. Full Equipment Overhaul | |
| - Disassemble and inspect all major components | |
| - Replace worn bearings, seals, and gaskets | |
| 2. Structural Integrity Check | |
| - Inspect frame for cracks or misalignment | |
| - Tighten all structural bolts | |
| 3. Electrical System Audit | |
| - Test all circuits and grounding | |
| - Replace damaged wiring | |
| 4. Performance Validation | |
| - Conduct extended test runs | |
| - Verify compliance with industry standards | |
Issues Identified:
- ________________________________________________________
- ________________________________________________________
Corrective Actions Taken:
- ________________________________________________________
- ________________________________________________________
Maintenance Performed By: _______________
Supervisor Approval: _______________
---
5. Troubleshooting & Corrective Actions Log
| Date | Issue Description | Possible Cause | Action Taken | Technician Name | Status (✔) |
|----------|----------------------|-------------------|------------------|--------------------|---------------|
| ________ | ____________________ | _________________ | ________________ | __________________ | ______________ |
| ________ | ____________________ | _________________ | ________________ | __________________ | ______________ |
---
6. Spare Parts & Inventory Log
| Part Name | Quantity | Last Replenishment Date | Next Reorder Date | Supplier Info |
|--------------|-------------|----------------------------|----------------------|------------------|
| Punches | ___ | ________ | ________ | ________ |
| Dies | ___ | ________ | ________ | ________ |
| Belts | ___ | ________ | ________ | ________ |
| Lubricant | ___ | ________ | ________ | ________ |
---
Conclusion
A structured maintenance log ensures that disinfection tablet presses operate efficiently, minimizing downtime and ensuring product consistency. By following this template, operators and technicians can systematically track inspections, repairs, and part replacements, leading to improved equipment reliability and regulatory compliance.
Regular reviews of maintenance logs help identify recurring issues, allowing for proactive improvements in maintenance procedures.
End of Document
(Word count: ~2000)
Copyright © 2025 Changzhou Wangqun Pharmaceutical Machinery Co., Ltd. Tous droits réservés.
Plan du siteCe site Web utilise des cookies pour vous garantir la meilleure expérience sur notre site Web.
Commentaire
(0)